Skip to main content
AL-Riyadh Ground Water Drainage System project showcase
Infrastructure1994

AL-Riyadh Ground Water Drainage System

Collection of rising ground water through (VCP) perforated pipes and transfer them towards; King Fahad Quarter : 10,580 m Al Taween : 1800 m Al Uraijah District : 6060 m The purpose of this project is to lower the shallow water table under the streets in above mentioned districts. The work includes trench excavation and pipe laying and all sorts of manhole constructions plus all the other items belonging to above mentioned system.

Client
Riyadh Development Authority
Timeline
19921994
Specifications
Infrastructure