Infrastructure1994
AL-Riyadh Ground Water Drainage System
Collection of rising ground water through (VCP) perforated pipes and transfer them towards; King Fahad Quarter : 10,580 m Al Taween : 1800 m Al Uraijah District : 6060 m The purpose of this project is to lower the shallow water table under the streets in above mentioned districts. The work includes trench excavation and pipe laying and all sorts of manhole constructions plus all the other items belonging to above mentioned system.
- Client
- Riyadh Development Authority
- Timeline
- 1992 — 1994
- Specifications
- Infrastructure