Refurbishment2015
Concrete Repair Works (Additional Structures) in Al-Khobar Power & Desalination Plant (Phase-2)
The purpose of this project is to carry out the concrete repair works of the additional structures. Total area to be demolished & re-constructed & repaired : 109,111 m2 Total Concrete Amount: 13,951 m3 Total Steel Reinforced : 2,120 Ton Total Structural Steel :113.75 Ton Total Excavation & Back-fill Amount: 15,647 m3
- Client
- Saline Water Conversion Corporation (SWCC)
- Location
- Khobar
- Timeline
- 2011 — 2015
- Specifications
- Refurbishment