Concrete Repair Works (Additional Structures) in Shoaibah Power & Desalination Plant (Phase-1) project showcase
Refurbishment2014

Concrete Repair Works (Additional Structures) in Shoaibah Power & Desalination Plant (Phase-1)

The purpose of this project is to carry out the concrete repair works of the additional structures. Total area to be demolished & re-constructed & repaired :112,823 m2 Total Concrete Amount: 15,777 m3 Total Steel Reinforced : 2,430 Ton Total Structural Steel : 489 Ton Total Excavation & Back-fill Amount: 26,294 m3

Client
Saline Water Conversion Corporation (SWCC)
Location
Shoaibah
Timeline
20102014
Specifications
Refurbishment