King Faisal University Infra-structure Work - Al Hassa-Phase 3 Contract No. 48 & 11 project showcase
Infrastructure2011

King Faisal University Infra-structure Work - Al Hassa-Phase 3 Contract No. 48 & 11

The purpose of this Project is; Site cleaning works, excavation works, backfilling works, sanitary sewer system, lift stations, well water system, sweet water network system, raw water network system, effluent water network system, chilled water supply, storm water drainage system, electrical works & communication cable trenches & manholes, MV cables (15kV) feeding main transformer (13.8 kV), low voltage cables (600-1000V), interior & external lighting & power outlets, grounding & lightning system. site improvement - road 1,2,3 work, bridge over east loop road, retaining wall at east loop road, water distribution system, sweet water network system, raw water network system, effluent water network system, compact substation, outdoor transformer MMC, distribution panels, ATS, Diesel generators, SCADA system, electrical works & communication cable trenches & manholes. Consortium Partner : FEMCO+YUKSEL Saudia.

Client
Ministry of Higher Education-King Faisal University
Location
Al-Hassa
Timeline
20072011
Specifications
Infrastructure