Riyadh-Qassim Water Transmission System Stations Terminal Contract No.4 project showcase
Pipeline & Reservoirs2003

Riyadh-Qassim Water Transmission System Stations Terminal Contract No.4

The purpose of this project is; (1) Construction of operating tanks o 8000 and 6000m3 capacity in Majma'ah & Al-Ghat. (2) Construction of Al Zilfi Isolation Valves. (3) Construction of Al Zilfi and Al-Ghat Terminal. Yuksel carried out the civil works and all electro-mechanical erection for this project as a consortium member with Ansaldo Industria S.p.A.

Client
Saline Water Conversion Corporation (SWCC)
Timeline
19952003
Specifications
Pipeline & Reservoirs