
Infrastructure2007
King Faisal University Permanent Campus Project - Phase 4 & 6
The purpose of this Project is; Pump stations, storm water pump stations, wells, grading & filling, road works, pavement, site development. Medium voltage, low voltage distribution, BMS/CCMS control system, telephone & data system security CCTV, MATV & P.A. system. Cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network, sanitary system network, drainage system network. Consortium Partner : FEMCO+YUKSEL Saudia.
- Client
- Ministry of Higher Education
- Location
- Khobar – Dammam
- Timeline
- 2004 — 2007
- Specifications
- Infrastructure
