Permanent Campus Project - Utilities Phase I, 2 & 3
The purpose of this project is to make the infrastructure and utilities for Phase I including site works, 525,000 m3 backfilling,180,000 m2 asphalt road, 140,000 m2 concrete walkway, 27,000 m underground piping which most of them under water table, 62,000 m MV, LC and outdoor lighting system, Utility building, RO building, Underground tank for raw water supply, pump stations buildings and wells and sewage treatment plant which has 1340 m3/day. The purpose of this project is to make the infrastructure and utilities for Phase 2&3I including site works, backfilling, asphalt road, concrete walkway, underground piping which most of them under water table and outdoor lighting system, Utility building, RO building, Underground tank for raw water supply, pump stations buildings and wells and sewage treatment plant.
- Client
- Ministry of Higher Education (MOHE)
- Location
- Hofuf
- Timeline
- 2002 — 2006
- Specifications
- Infrastructure