KFU Al Hassa Infrastructure for the University City Phase 4 - Stage 1A
The purpose of this Project is; Boring of a number of 4 ground wells 450 m deep, asphalt works of level reaches to 303,000 m, green levels of 23,456 m, irrigation network for palm trees, trees and the green levels landscaping site and gates for Girls Colleges with granite for level of 50,000 m waster collection containers, benches, water coolers, fountains, brojors, bus-stops, steel fence around the college. Also connection of cables within the general site into boys/girls housing, supply of BMS system and infrastructure works for rain drainage, sewage and clear water network beside roads, bus-stops and housing connection, belt bress system as well as works for the bridge linking girls college to the housing. Consortium Partner : FEMCO+YUKSEL Saudia.
- Client
- MOHE - Ministry of Higher Education
- Location
- Hofuf
- Timeline
- 2011 — 2013
- Specifications
- Infrastructure