Infrastructure2013
King Faisal University - Teaching Hospital Al Hassa -Phase 1 & Phase 2
Project Description : Civil Mechanical, Electrical Infrastructure & Utilities Works. The Scope of Work Includes: Exaction and fitting, storm water system, underground piping and valves, manhole and catch basin work, side walks, drinking, RAW & fire water networks, fire fighting system, sanitary sewer system, irrigation system, CCTV, CCM & BMS system, telecommunication system, earth work, concreting, architectural work, thermal & moisture protection, conveying systems, pumps, cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network, drainage system network. Consortium Partner : FEMCO+YUKSEL Saudia.
- Client
- Ministry of Higher Education-King Faisal University
- Location
- Hofuf
- Timeline
- 2010 — 2013
- Specifications
- Infrastructure